CDM 2015 Compliance. Sorted in Seconds.
Stop spending hours writing RAMS, method statements and H&S plans from scratch. MyQS generates project-specific compliance documents from your scope description — fully structured to CDM 2015 standards.
Every compliance document you need
Generate all four core CDM 2015 document types from a single platform — tailored to your project
RAMS
Risk Assessments & Method Statements
Combined risk assessment and method statement documents covering hazard identification, risk ratings, control measures, emergency procedures and safe systems of work for every activity on site.
Method Statements
Step-by-Step Safe Work Procedures
Detailed work procedures describing how each task will be carried out safely, including sequence of operations, equipment required, competency requirements and supervision arrangements.
H&S Plans
Health & Safety Plans
Construction phase plans covering site rules, emergency procedures, welfare arrangements, site management structure, communication protocols and arrangements for monitoring compliance.
COSHH Assessments
Control of Substances Hazardous to Health
Substance-specific assessments identifying hazardous materials on your project, exposure risks, required PPE, storage requirements, first aid measures and disposal procedures.
Built for construction professionals
How it works
Three steps from blank page to site-ready compliance document
Describe your scope
Enter your project details — trade type, activities, site conditions and any specific hazards. The more detail you provide, the more tailored your documents will be.
AI generates your documents
MyQS analyses your scope and produces fully structured compliance documents with hazard registers, risk matrices, control measures and method statements — in seconds.
Review and download
Review the generated document, make any edits, then download as a branded PDF ready to submit on site or send to your client.
Understanding CDM 2015
The Construction (Design and Management) Regulations 2015 place duties on everyone involved in construction work in the UK
Principal Designer
Plan, manage and monitor pre-construction phase. Ensure designers comply with duties. Prepare and update the health and safety file. Provide pre-construction information to contractors.
Principal Contractor
Plan, manage and monitor the construction phase. Produce the construction phase plan. Organise cooperation between contractors. Ensure suitable site inductions and welfare facilities.
Contractors
Plan, manage and monitor own work. Provide workers with relevant information and training. Comply with the construction phase plan. Report anything likely to endanger health or safety.
Workers
Cooperate with others on health and safety matters. Report anything that endangers health or safety. Must be consulted on matters affecting their health, safety and welfare on site.
MyQS helps you meet your documentation duties under CDM 2015 — generating project-specific RAMS, method statements, H&S plans and COSHH assessments that cover the required content.
Frequently asked questions
Under CDM 2015, construction projects in the UK typically require RAMS (Risk Assessments and Method Statements), method statements, health and safety plans, and COSHH assessments. Principal Designers must ensure pre-construction information is prepared and the health and safety file is established, while Principal Contractors must produce the construction phase plan and coordinate site safety. The specific documents depend on project size and complexity.
Yes. MyQS generates project-specific RAMS documents from your scope description in seconds. The AI analyses your project details — including trade types, site conditions and activities — and produces a comprehensive risk assessment with method statements tailored to your specific job, including hazard identification, risk ratings, control measures and safe systems of work.
MyQS offers a free tier that includes basic access to compliance document generation. The Pro plan at £69/month gives you the full compliance suite with branded output and PDF downloads. Each compliance document costs 7 credits to generate. Paid plans start from just £29/month for the Starter tier.
MyQS generates RAMS documents structured to CDM 2015 standards, including all required sections such as hazard identification, risk ratings, control measures, emergency procedures and method statements. However, as with any compliance document, the output should always be reviewed by a competent person familiar with the specific site conditions and project requirements before being adopted on site.
Generate Your First RAMS — Free
Stop writing compliance documents from scratch. Get site-ready RAMS, method statements and H&S plans in seconds.
Start FreeNo credit card required