Professional programmes, built fast
Everything you need to plan, schedule and track your construction project from start to handover
Gantt Chart Builder
Drag-and-drop Gantt charts with trade bars, duration editing and week-by-week timeline. Resize, reorder and group tasks visually.
Critical Path Analysis
Automatically identifies the longest dependency chain through your programme. See exactly which tasks drive your completion date.
AI Optimisation
Haiku analyses your programme, suggests trade overlaps where safe, and flags unrealistic durations - so you finish faster without cutting corners.
How it works
From Bill of Quantities to finished programme in four steps
Import your BoQ
Upload a priced BoQ or generate one with MyQS. Categories are automatically mapped to construction trades.
Auto-generate programme
MyQS builds a Gantt chart with estimated durations, trade sequencing and realistic overlap between dependent trades.
Refine with AI suggestions
AI reviews your programme, flags unrealistic timelines, and suggests where trades can safely overlap to shorten the schedule.
Export PDF
Download a professional programme PDF with colour-coded trade bars, week columns, durations and cost-per-trade breakdown.
Built for real construction scheduling
WBS hierarchy
Unlimited depth work breakdown structure. Group tasks by phase, trade or location - nest as deep as your project needs.
4 dependency types
Finish-to-Start, Finish-to-Finish, Start-to-Start, and Start-to-Finish with configurable lag and lead times.
Baseline tracking
Save a baseline snapshot and compare planned vs actual progress. See slippage at a glance with colour-coded variance indicators.
Bulk operations & shortcuts
Select multiple tasks, bulk-edit durations, move trades, and reassign dependencies. Full keyboard shortcut support for power users.
Tab / Shift+Tab indent
Indent and outdent tasks to restructure your WBS on the fly. Drag-and-drop reordering with automatic dependency adjustment.
Cost-loaded programme
Each trade bar shows its cost from the BoQ. See spend distribution across the timeline and identify cash-flow peaks.
Smarter schedules with AI optimisation
MyQS analyses your programme and makes intelligent suggestions to tighten the schedule without compromising quality. It understands construction trade sequencing and knows which activities can safely overlap.
"Plastering and first fix electrical can overlap by 40% - plasterers work room-by-room while electricians follow behind. This saves approximately 1.5 weeks."
"Painting duration of 2 weeks looks short for 14 rooms. Recommend 3.5 weeks based on 1 decorator at 2 rooms per week."
"Kitchen fitting has 5 days of float. Consider starting earlier to de-risk the final handover date."
Frequently asked questions
A construction programme is a Gantt chart that maps out every trade in sequence - showing task durations, dependencies between trades, and the critical path through the project. It is the primary scheduling tool used on UK construction sites to coordinate subcontractors and track progress against planned dates.
Yes. MyQS auto-generates a construction programme directly from your Bill of Quantities. It maps BoQ categories to standard construction trades, estimates durations, applies realistic trade overlap, and produces a Gantt chart with dependencies - ready to refine or export as PDF.
Critical path analysis identifies the longest chain of dependent tasks through your programme. Any delay to a task on the critical path pushes back the entire project completion date. MyQS highlights the critical path automatically so you can focus resources where they matter most.
MyQS offers a free tier that lets you explore sample programmes and understand the Gantt chart interface. The Pro plan unlocks full programme creation from your own BoQ data, AI optimisation suggestions, baseline tracking and PDF export - starting from just £149/month.